| Model | Arc Sport Greenline 40 |
| Announced | February 2024 2010 |
| launched | Late 2024 (first deliveries began) 2011 |
| price | $258,000 (up to ~$268,000 with options) Starting from €414,000 (≈ $560,000 USD); used units from ~$270,000 |
| Length Overall (LOA) | 23 ft (7.01 m) 11.99 m (39’4″) |
| Beam | ~8.5 ft (2.59 m) 4.25 m (13’11″) |
| Draft | Not officially disclosed (typical wake boats: ~2 ft) 0.85 m (2’9″) |
| Light displacement | Not officially disclosed ~8,000 kg (17,600 lb) |
| Others | Tow tower with retractable design for storage and clearance CE Certification Category B (offshore); Super-displacement hull |
| Solar array | None Integrated solar panels (~1.8 to 2.0 kW) |
| Battery Capacity | 226 kWh lithium-ion ~40–44 kWh lithium-ion (depending on config) |
| Electric motors | Single high-performance inboard motor (approx. 500–570 hp equivalent) Twin electric H-Drive motors (≈14 kW each) |
| Cruising speed | 20–25 mph (wake speed); top speed capped at ~40 mph ~7 knots (electric); up to 22 knots (diesel) |
| Range |
Wake use: 4–6 hours Low-speed cruise: 24+ hours Electric only: ~25 nm @ 5–6 knots Diesel: up to ~700 nm @ 7 knots |
| Others |
Supports Level 2 & DC fast charging (0–80% in ~45 mins) Liquid-cooled battery system Hybrid drive system (electric + Yanmar diesel engines up to 250 hp x2) Regenerative charging via propeller under sail/diesel power |
| Guest cabins | None (open day boat) 2 (forward master + starboard twin) |
| Guest capacity | Up to 15 passengers 4–6 persons |
| Layouts |
Wake sport open bow layout with dual touchscreen helm
Open-plan salon with convertible dinette Aft galley opens to cockpit with drop-down transom |
| Others | Custom surf wave control, tower-integrated sound system Full bathroom (with separate shower), panoramic windows, electric sunroof (optional) |
| Water tanks | Ballast tanks only (computer-controlled for wake shaping) 400 L |
| Fuel tanks | None (fully electric) 700 L (diesel) |
| Tender garage | None Not available (but wide swim platform) |
| Salon | Open seating area with premium marine upholstery Full beam with wraparound views, connects to cockpit |
| Others |
Bow/stern thrusters + joystick docking Dual helm touchscreens JL Audio sound system Wireless charging pads Auto-fill ballast system Air conditioning (optional) Bow thruster Integrated solar energy management system Side boarding gates (port/starboard) |
| Builder | Arc Boat Company, California, USA Greenline Yachts (SVP Avio d.o.o), Slovenia |
| Launch milestone | First prototype tested in 2023, Announced in Feb 2024, Deliveries began Q4 2024 and scaling through 2025 First unit launched in 2011 as part of Greenline’s hybrid yacht series |
|
We can not guarantee that the information on this page is 100% correct